Concise

RIBA Professional Services Contract.

9. RIBA Work Stage 2: Concept Design.
RIBA Work Stage 2: Concept Design is the stage of a construction project where the initial design concepts are developed and refined into a cohesive concept design.
9.1. If Architecture North Ltd has not been appointed for this scope of work, administration costs will be charged to undertake this scope of work.
9.2. The Client shall engage the services of the Architecture North Ltd to provide the architectural services for RIBA Work Stage 2 as set out within the Project Acceptance Client Approval.
9.3. The Architecture North Ltd shall provide the following services for RIBA Work Stage 2:
(a). Develop, and refine the design proposals and prepare the concept design to meet the Clients’ project brief.
(b). Undertake client project revision requests as outlined in clause 16.
(c). Walk through the design in true 1:1 scale using CAD, BIM, or other proprietary software drawings and documents relevant to the scale of works to outline and justification for the overall design approach.
(d). To record all design meetings for your personal project records.
9.4. The Client shall promptly sign off the Client Approval RIBA Work Stage 2 Sign-Off Form presented by the Architecture North Ltd indicating approval of the work performed.
9.5. The Architecture North Ltd shall not be held liable for any delays or errors resulting from the Client's failure to timely approve or sign Client Approval Forms.
9.6. Clients within RIBA Work Stage 2 project revisions are subject to the revisions outlined in their approved quotation, including points: 16.1, 16.2, 16.3, 16.4, 16.5, 16.6, 16.7, 16.8 and 16.9.
9.7. Upon the client's approval of RIBA Work Stage 2, all allocated revision requests within the client-approved quotation will be considered closed.
9.8. The Architecture North Ltd shall instruct and undertake any additional requests within the Client Approval RIBA Work Stage 3 Sign-Off Form within 5 business days.
9.9. The client understands an invoice will be raised for the additional approved scope of works.